Master Bath Remodel – Getting Ready For Tile

Adding the new plumbing was a little complicated. I drew up a design on paper and then we had to translate that, virtually, over exposed 2×6 wall structure. This included a thermostatic control/mixer, 2 body sprays, a shower wand, and a shower/rain head mounted high on the wall. Next came a concrete pan for the shower that was followed by fiberglass work to waterproof the entire bottom structure of the new shower stall.

There’s an interesting aspect to laying down the fiberglass and allowing it to cure…..it stinks. It permeates the entire house for several days. I was warned about this fact and I moved from my bedroom to the guest bedroom in preparation. I think I’ll just stay there till it’s all finished.

Plumbing, pan, and waterproofing